EGR Salisbury (Refurbishment)


2,800.m2.of Hychem S.F.20 FG High Solid Epoxy (Pewter) with the walkways (Rarsbery) refurbishment to their Thermo Plastic Division at Evans Road Salisbury.

EGR.jpg

 

EGR_JPG.jpg

 

EGR_2.jpg

Hychem_logo.gif